|
Once the spring hat has been welded in, the lower control arm should be bolted up and checked for fit and alignment. Since Da Rod Shop has been doing so many IFS swaps lately, Bobby fabricated this cool tool to help move things along a little faster. By welding a length of threaded rod to a 4-inch piece of round tubing, the suspension can be mocked up without actually using a shock and spring to hold up the lower control arm. View Related Article
|
|